15t overhead cranes are sold from China to Algeria
As an excellent Chinese crane supplier providing crane services for the world, we can provide Algerian customers with various types of cranes and accept crane customization services in special working environment. In fact, due to the limitation of working environment, the cranes required by different customers rarely have exactly the same situation. This will test the ability of a crane supplier. Today, we will share an order for 15 tonnes de ponts roulants à partir de L'algérie. I hope it can help you
Main parameters of overhead crane in Algeria
- Lifting capacity: 15 Ton
- Hauteur de levage: 9 mètres
- Span: 24 meters,
- Voltage: 380V, 50Hz, 3P,
Installation of overhead cranes for Algerian customers
Hoisting machinery is a special type of equipment and has a high degree of danger. Therefore, in the installation of cranes, safety work is particularly important. Special attention must be paid to the following aspects:
- Most of the cranes are mechanical devices with large structures and complicated structures. Usually, it is difficult to transport the entire crane. It is often the entire assembly of the equipment that is transported to the site of use. Therefore, it must be properly installed to reflect the overall eligibility of the crane in order to verify the integrity and integrity of the crane.
- The overhead crane is to be operated on the track of the use site or the building. Therefore, for the operational track or the installation foundation, and whether the crane itself can work well with each other, whether the operation is adaptable and whether it can meet the strict requirements for use, it must be concluded through proper installation and commissioning and inspection after installation.
- The safety requirements of cranes are extremely high, and the safety devices must be perfect and installed correctly to achieve reliable, flexible, and accurate technical requirements.
- According to the importance of crane safety work, in order to enable the crane to meet the operational requirements of various loads after being put into use, the crane must be tested for no-load, full-load, and overload static load and dynamic load in accordance with regulations. However, these tests must be carried out in the operating state or in a certain stationary state of the crane mechanism. This requires the use of a load test after the crane has been installed.
- The overhead crane's wire ropes and other flexible parts and many other parts will undergo some elongation, deformation, looseness, etc. after the initial load. This also requires repairs, adjustments, handling, and tightening after the crane has been mounted and the load has been tested. Therefore, it is necessary to do a series of work such as crane installation, commissioning, and speed control to ensure safe and normal use of the crane in the future.
The other overhead crane cases in Algeria
How to customize Overhead Crane in Algeria
Nous sommes un fabricant de la grue située en Chine, fournissant grue de personnalisation de services aux clients de grues. Si vous souhaitez personnaliser un pont roulant, vous pouvez laisser un message sur le site ou E-mail: sales010@cranesdq.com, dites-nous les informations suivantes, et notre directeur des ventes communiquera avec vous:
- Capacité de levage (t): __ ?( La capacité nominale)
- Hauteur de levage (m):__ ? (Hauteur à partir du crochet centre à l'étage)
- Span (m): __ ? (La Distance entre le rail du centre)
- Vitesse de levage (m/min): __ ? ( Simple, Double, Variable)
- Voyager distance (m): __ ? (La longueur du rail)
- Travail duty: __ ? (Combien d'heures par jour? Combien de fois par heure?)
- Quel matériel pour être soulevé: __ ?
- Industriel de tension: __ ? ( comme :380V, 50Hz, 3ph )
Les Vues Post: 1 319