Lifting weight limiter is also called overload limiter. In order to ensure that the electric single girder crane is not overloaded, it is generally necessary to install a lifting weight limiter. The lifting mechanism of the electric single beam crane is an electric hoist. Therefore, the installation form of the lifting weight limiter on the electric single beam crane depends on the installation position of the load sensor on the electric hoist. Generally, there are three installation forms of crane limiter on electric single beam crane: fixed pulley type, hook type and wire rope type.
There are three installation methods for single-beam crane lifting weight limiter: fixed pulley type, hook type and wire rope type
TSG Q7016-2008 "Regulations for the Supervision and Inspection of Major Maintenance of Lifting Machinery Installation and Renovation" and TSG Q7015-2008 "Regular Inspection Rules for Lifting Machinery" both stipulate that electric single-beam cranes should be equipped with lifting weight limiters, and require: (1 ) Lift the rated load, raise and lower at the rated speed, brake normally for 3 times during the whole process, and the lifting weight limiter will not operate; (2) Keep the load 100mm~200mm from the ground, and continue to load to 1.05 times without impact. Rated lifting capacity, check whether the overload alarm signal is issued first, and then cut off the upward movement, but the mechanism allows movement in the downward direction.
Свяжитесь с нашими специалистами по кранам
Отправьте нам сообщение, и мы свяжемся с вами как можно скорее.