Single Girder Crane Installation Preparation and Considerations
After Single Girder Crane to the user’s site, check to verify whether the number of components are consistent, with defect or not, problem should be solved promptly.
When Single Girder Crane unloading and handling, should pay special attention to avoid the single girder crane affected by twisting, bending, impact and other accidents, hoisting should be through lifting holes (see Figure 9), edges and corners should be pad with underlay.
Figure 9 Single Girder Crane Hoisting Sketch
Single Girder Crane Bridge Assembly
Single Girder Crane main beam and end beam can be connected by split bolts, bolting connect before overall installation. (see Figure 10)
Figure 10 Single Girder Crane Main Girder and End Girder Connection
Single Girder Crane Installation and Erection Plan
Before the new plant covered roof, above the plant track has enough space, using mobile crane directly lift overall Single Girder Crane, when lift height over the rail top, use rope pulling to rotate the single girder crane, lay down the crane when wheel groove aligning track.