HomeNews → 20/5t bridge crane full explanation

20/5t bridge crane full explanation

1. Introduction

Bridge crane, as one of the core equipment in modern industrial material handling system, undertakes the heavy task of lifting, transporting and stacking heavy objects. In various industrial environments, such as workshops, warehouses, docks, etc., bridge cranes have become an indispensable part with their high efficiency, stability and safety. Among them, 20/5t bridge cranes have become the preferred equipment in many industrial fields with their unique performance parameters and wide application scenarios. This article will comprehensively analyze all aspects of 20/5t bridge cranes, from basic structure, working principle to performance parameters, installation and commissioning, operation and maintenance, and safety management, aiming to provide relevant practitioners with a detailed technical reference.

50T double beam bridge crane

2. Basic structure and working principle

(I) Basic structure

The basic structure of 20/5t bridge crane mainly includes four parts: metal structure, operating mechanism, lifting mechanism and electrical control system.

Metal structure

The metal structure is the main load-bearing component of the bridge crane, mainly including the main beam, end beam and trolley frame. The main beam is the main load-bearing structure of the crane, usually adopting a box structure with high strength and rigidity. The end beam is connected to both ends of the main beam to form the overall frame of the crane. The trolley frame is installed on the main beam to carry and operate the lifting mechanism.

Operating mechanism

The operating mechanism includes the trolley operating mechanism and the trolley operating mechanism. The trolley operating mechanism is responsible for the movement of the crane on the horizontal plane, and is usually composed of a drive device, a wheel set, a track and a brake. The trolley operating mechanism is responsible for the movement of the trolley frame on the main beam. Its structure is similar to that of the trolley operating mechanism, but its size and carrying capacity are smaller.

Lifting mechanism

The lifting mechanism is a key component for lifting and lowering heavy objects in a bridge crane. It usually consists of a motor, a reducer, a drum, a wire rope and a pulley block. The motor drives the drum to rotate through the reducer, so that the wire rope is wound or released on the drum, thereby realizing the lifting and lowering of the heavy object. The pulley block plays a role in changing the direction of movement of the wire rope and increasing the lifting force.

Electrical control system

The electrical control system is the nerve center of the bridge crane, responsible for receiving operating instructions, controlling the actions of the operating mechanism and the lifting mechanism, and realizing safety protection and other functions. It usually consists of power supply, control electrical appliances, protective electrical appliances and lines. Modern bridge cranes usually use programmable logic controllers (PLC) as the control core, which has the advantages of simple operation, high reliability and easy maintenance.

(II) Working principle

The working principle of the 20/5t bridge crane is based on the command drive of the electrical control system, and the heavy objects are transported through the coordinated action of the operating mechanism and the lifting mechanism.

Receiving and transmitting operating instructions

The operating instructions are usually input into the electrical control system by the operator through the operating handle or button. After receiving the instructions, the electrical control system converts them into electrical signals and transmits them to the corresponding actuators.

Implementation of the action of the operating mechanism

The electrical control system drives the wheel group of the trolley and car operating mechanism to move on the track by controlling the start, stop and steering of the motor. At the same time, by controlling the action of the brake, the accurate parking and braking of the operating mechanism are realized.

Implementation of the action of the lifting mechanism

The electrical control system drives the drum to rotate and wind or release the wire rope by controlling the speed and steering of the motor, thereby realizing the lifting and lowering of the heavy objects. At the same time, by controlling the combination and number of pulley groups, the lifting force and movement direction can be adjusted.

Implementation of safety protection mechanism

The electrical control system also has a variety of safety protection mechanisms, such as limit switches, overload protection, overcurrent protection, etc. When the crane runs to the limit position or an abnormal situation occurs, these protection mechanisms will immediately start and cut off the power supply to ensure the safe operation of the crane.

3. Performance parameters and specifications

The performance parameters and specifications of 20/5t bridge cranes are important indicators for measuring their performance and scope of use. These parameters and specifications usually include lifting capacity, span, lifting height, operating speed, and working level.

(I) Lifting capacity

The lifting capacity is one of the main performance parameters of bridge cranes, which indicates the maximum weight that the crane can safely lift and carry. 20/5t bridge cranes have two lifting capacity configurations, 20 tons and 5 tons. This means that the crane can choose to use a lifting capacity of 20 tons or 5 tons for operation according to actual needs. At the same time, the crane can also achieve a combination of two lifting capacities to meet more complex handling needs.

(II) Span

The span refers to the distance between the two ends of the main beam of the bridge crane, and is also one of the important indicators for measuring the scope of use of the crane. The span of a 20/5t bridge crane is usually determined according to the actual situation on site, and the common span range is between 10 meters and 30 meters. Different span configurations can meet the needs of different industrial environments and ensure that the crane can achieve efficient handling operations in a limited space.

(III) Lifting height

Lifting height refers to the maximum height to which a crane can lift a heavy object. The lifting height of a 20/5t bridge crane is usually customized according to actual needs, and the common lifting height range is between a few meters and tens of meters. A higher lifting height can meet the handling needs of heavy goods, while a lower lifting height is suitable for industrial environments with limited space.

(IV) Operating speed

Operating speed is one of the important indicators for measuring the operating efficiency of a bridge crane. The operating speed of a 20/5t bridge crane usually includes the trolley running speed, the trolley running speed and the lifting speed. These speed parameters can be adjusted and optimized according to actual needs to achieve more efficient handling operations. At the same time, in order to ensure the safe operation of the crane, the operating speed must also meet relevant standards and regulations.

(V) Working level

The working level refers to the working life and performance level that a bridge crane can achieve under specified conditions of use. The working level of a 20/5t bridge crane is usually determined based on factors such as frequency of use, working environment and load conditions. Different working levels correspond to different service life and performance requirements to ensure that the crane can maintain stable performance under different conditions of use.

4. Installation and commissioning

The installation and commissioning of 20/5t bridge crane is an important part to ensure its normal operation and extend its service life. This part requires professional technicians to operate and strictly abide by the relevant installation and commissioning specifications.

(I) Preparation before installation

Before installing the 20/5t bridge crane, sufficient preparation is required. These tasks include site survey, foundation construction, preparation of equipment and materials, and personnel training.

Site survey

Site survey is the first task before installation. Technicians need to conduct a detailed survey of the installation site to understand the environmental conditions, spatial layout, and specific installation location of the crane. At the same time, the site needs to be cleaned and organized to ensure that there are no obstacles and safety hazards during the installation process.

Foundation construction

Foundation construction is one of the key steps in installing a 20/5t bridge crane. According to the weight and size of the crane, technicians need to design and construct a suitable foundation structure. These foundation structures usually include concrete foundations, embedded parts, and anchor bolts. During the foundation construction process, it is necessary to ensure the stability and firmness of the foundation structure to support the weight of the crane and withstand the vibration and impact during its operation.

Preparation of equipment and materials

Before installing a 20/5t bridge crane, the required equipment and materials need to be prepared. These equipment and materials include the crane body, electrical control system, rails, wheel sets, wire ropes, etc. At the same time, it is also necessary to prepare the tools and equipment required during the installation process, such as cranes, welders, bolt wrenches, etc. When preparing equipment and materials, it is necessary to ensure that their quality meets relevant standards and regulations to ensure the quality and safety of the installation.

Training of personnel

Before installing a 20/5t bridge crane, professional training and guidance are required for the installers. These training contents include the structure and working principle of the crane, installation steps and methods, safe operating procedures, etc. Through training, installers can become familiar with the performance and characteristics of the crane, master the correct installation methods and operating skills, and ensure the safety and quality of the installation process.

(II) Installation steps and methods

When installing a 20/5t bridge crane, it is necessary to follow strict steps and methods. These steps and methods usually include the assembly and welding of metal structures, the installation of operating mechanisms and lifting mechanisms, and the wiring and debugging of electrical control systems.

Assembly and welding of metal structures

Assembly and welding of metal structures is the first step in installing a 20/5t bridge crane. Technicians need to assemble and weld metal structural components such as the main beam, end beam and trolley frame according to the drawings and specifications. During the assembly process, it is necessary to ensure that the connection between the various components is firm and reliable, and meets the relevant size and tolerance requirements. During the welding process, appropriate welding methods and process parameters need to be used to ensure the quality and strength of the weld.

Installation of the running mechanism and the lifting mechanism

During the installation of the running mechanism and the lifting mechanism, technicians need to assemble and debug the various components according to the drawings and specifications. This includes the installation of the drive unit, the installation of the wheel set, the laying of the track, and the debugging of the brake. During the installation process, it is necessary to ensure that the various components cooperate well and meet the relevant size and tolerance requirements. At the same time, it is also necessary to debug and check the various components to ensure that they are flexible, accurate and reliable.

Wiring and debugging of the electrical control system

The wiring and debugging of the electrical control system is one of the key steps in installing a 20/5t bridge crane. Technicians need to wire and debug the various components of the electrical control system according to the drawings and specifications. This includes laying of power lines, wiring of control lines, installation of protective appliances, and programming and debugging of PLCs. During the wiring process, it is necessary to ensure that the line connection is firm and reliable and complies with relevant electrical safety specifications. During the debugging process, the electrical control system needs to be functionally tested and verified to ensure that it can work normally and meet the design requirements.

(III) Debugging and acceptance

After the installation of the 20/5t bridge crane is completed, debugging and acceptance work is required. These tasks include no-load test, load test, and safety and reliability assessment.

No-load test

No-load test is the first step in debugging a 20/5t bridge crane. During the no-load test, technicians need to start the crane and run each mechanism to check whether its movement is flexible, accurate and reliable. At the same time, it is also necessary to check whether the various functions of the electrical control system are working properly, such as limit switches, overload protection, etc. Through the no-load test, it can be preliminarily judged whether the crane meets the design requirements and use requirements, laying the foundation for subsequent load tests and safety assessments.

Load test

Load test is a key link in debugging a 20/5t bridge crane. During the load test, technicians need to lift, carry and stack the crane according to the specified load and working conditions. Through the load test, the load capacity, stability and safety of the crane can be tested to ensure that it can work normally under the specified conditions of use. During the load test, various parameters and data, such as lifting weight, lifting height, operating speed and various functions of the electrical control system, need to be recorded to provide a basis for subsequent safety and reliability evaluation.

Safety and reliability evaluation

Safety and reliability evaluation is the last step in the commissioning of the 20/5t bridge crane. During the evaluation process, technicians need to conduct a comprehensive inspection and test of the various components and systems of the crane, including the strength of the metal structure, the stability of the operating mechanism, the reliability of the lifting mechanism and the safety of the electrical control system. At the same time, it is also necessary to train and assess the operators and maintenance personnel of the crane to ensure that they have proficient operating skills and safety awareness. Through the safety and reliability evaluation, the performance and quality level of the crane can be comprehensively evaluated to ensure that it meets the requirements of relevant standards and regulations.

During the commissioning and acceptance process, if any problems or defects are found in the crane, the technicians need to deal with and rectify them in a timely manner. This includes repairing damaged parts, adjusting improper parameters, and optimizing unreasonable structures, etc. Through rectification and optimization, it can ensure that the crane meets the design requirements and use requirements, providing strong guarantee for subsequent formal use.

5. Operation and maintenance

The operation and maintenance of 20/5t bridge cranes are important links to ensure their normal operation and extend their service life. Correct operation methods and effective maintenance measures can significantly improve the performance and safety of the crane, and reduce the failure rate and maintenance costs.

(I) Operation procedures and precautions

When operating a 20/5t bridge crane, it is necessary to strictly abide by the operating procedures and precautions. These procedures and precautions usually include pre-operation inspection and preparation, operating steps and techniques for lifting operations, and emergency handling methods.

Pre-operation inspection and preparation

Before operating a 20/5t bridge crane, detailed inspection and preparation are required. This includes checking whether the various components and systems of the crane are intact and normal; checking whether the various functions of the electrical control system are working properly; checking whether the on-site environment is safe and barrier-free, etc. Through inspection and preparation, potential safety hazards can be discovered and eliminated in a timely manner to ensure the normal operation of the crane and the safety of the operator.

Operation steps and techniques for lifting operations

During the lifting operation, it is necessary to operate in accordance with the prescribed operating steps and techniques. This includes starting the crane and running each mechanism; selecting the appropriate lifting weight and lifting height; controlling the operating speed and direction of the crane, etc. At the same time, attention should also be paid to details and skills during operation, such as smoothly lifting and lowering heavy objects, avoiding shock and vibration, etc. Through correct operating steps and techniques, the stability and safety of the crane can be ensured, and the efficiency and quality of operation can be improved.

Methods for handling emergencies

During the lifting operation, various emergencies may be encountered, such as electrical failure, mechanical failure or loss of control of heavy objects. In these cases, the operator needs to take emergency measures quickly to ensure the safety of himself and the surrounding personnel. This includes immediately cutting off the power supply and stopping the operation of the crane; using emergency brakes or manual control devices to control the movement of heavy objects; timely reporting and seeking help from professionals, etc. Through correct emergency handling measures, the risk of accidents and losses can be minimized.

(II) Maintenance and fault diagnosis

The maintenance and fault diagnosis of 20/5t bridge cranes are important means to ensure their normal operation and extend their service life. Through regular maintenance and timely fault diagnosis, potential problems and defects can be discovered and repaired in time, and the performance and safety of the crane can be improved.

Content and cycle of daily maintenance

Daily maintenance is the basis of maintenance of 20/5t bridge crane. It usually includes several aspects such as cleaning, lubrication, tightening and inspection. In terms of cleaning, it is necessary to regularly clean the various components and systems of the crane to remove dust, oil and debris. In terms of lubrication, it is necessary to perform lubrication operations according to the prescribed lubrication cycle and lubrication points to ensure that the friction and wear between the various components are reduced. In terms of tightening, it is necessary to check and tighten the fasteners such as connecting bolts and nuts between the various components to ensure that the connection is firm and reliable. In terms of inspection, it is necessary to conduct a comprehensive inspection of the various components and systems of the crane to promptly discover and deal with potential problems and defects.

Diagnosis and troubleshooting methods for common faults

During use, 20/5t bridge cranes may have various common faults. These faults usually include electrical faults, mechanical faults and hydraulic faults. For electrical faults, they can be diagnosed and eliminated by checking the circuits, electrical components and sensors of the electrical control system. For mechanical faults, they can be diagnosed and eliminated by checking components such as transmission devices, bearings and connectors. For hydraulic faults, they can be diagnosed and eliminated by checking components such as hydraulic pumps, hydraulic valves and hydraulic cylinders. When diagnosing and troubleshooting, it is necessary to follow the principle of easy first and difficult later, external first and internal later, gradually investigate and determine the cause of the fault, and then take appropriate repair measures to repair it.

Replacement and repair skills of parts

During the maintenance process, some parts of the crane may need to be replaced or repaired. This includes electrical components, transmission devices, bearings and connectors. When replacing or repairing parts, it is necessary to follow relevant repair skills and precautions. For example, when replacing electrical components, it is necessary to ensure that the new components are the same model and specification as the old components; when replacing transmission devices, it is necessary to ensure that the transmission ratio and transmission efficiency meet the requirements; when replacing bearings, it is necessary to ensure that the model and accuracy of the bearings meet the requirements. At the same time, it is also necessary to pay attention to safety and hygiene issues during the maintenance process to avoid causing problems such as personal injury or environmental pollution.

6. Safety management and risk control

Safety management and risk control are important links to ensure the safe operation of 20/5t bridge cranes. By establishing a sound safety management system and regulations, strengthening the implementation of risk control and preventive measures, and improving the safety awareness and operating skills of operators, the safety risks of cranes can be significantly reduced and the life safety of operators can be guaranteed.

(I) Safety management system and regulations

Establishing a sound safety management system and regulations is the basis for ensuring the safe operation of 20/5t bridge cranes. These systems and regulations usually include training and assessment requirements for operators, safety inspection and evaluation standards for equipment, and accident emergency plans and drill processes.

Training and assessment requirements for operators

In order to ensure that the safety awareness and operating skills of operators meet the requirements, they need to be trained and assessed regularly. This includes comprehensive safety education and skills training for new employees; regular safety knowledge updates and operating skills improvement training for employees. At the same time, it is also necessary to assess and evaluate the training results of operators to ensure that they have proficient operating skills and good safety awareness.

Safety inspection and evaluation standards for equipment

In order to ensure that the safety and reliability of 20/5t bridge cranes meet the requirements, they need to be regularly inspected and evaluated. This includes comprehensive inspections of various components and systems of the crane; monitoring and evaluation of the performance parameters and operating status of the crane. Through safety inspections and evaluations, potential safety hazards and problems can be discovered and dealt with in a timely manner to ensure the normal operation of the crane and the safety of the operator.

Accident emergency plan and drill process

In order to deal with possible lifting accidents and minimize the risk and loss of accidents, it is necessary to formulate a complete accident emergency plan and organize drills regularly. This includes clarifying the process and division of responsibilities for accident emergency response; formulating targeted emergency measures and rescue plans, etc. Through the formulation and drill of accident emergency plans, the ability and level of operators to deal with emergencies can be improved, ensuring that correct emergency measures can be taken quickly and effective rescue work can be carried out when an accident occurs.

(II) Risk control measures

In addition to establishing a sound safety management system and regulations, targeted risk control measures need to be taken to reduce the safety risks of 20/5t bridge cranes. These measures usually include strengthening the safety protection and monitoring of electrical control systems, regular inspection and maintenance of metal structures and operating mechanisms, and improving the safety awareness and operating skills of operators.

Strengthening the safety protection and monitoring of electrical control systems

The electrical control system is one of the key components of the 20/5t bridge crane, and its safety and reliability have an important impact on the operating stability and safety of the crane. Therefore, it is necessary to strengthen the safety protection and monitoring of the electrical control system. This includes regular inspection and maintenance of the circuits, electrical components and sensors of the electrical control system; real-time monitoring and evaluation of the operating status of the electrical control system, etc. By strengthening the safety protection and monitoring of the electrical control system, potential safety hazards and problems can be discovered and dealt with in a timely manner to ensure the normal operation of the electrical control system and the safety of the crane.

Regular inspection and maintenance of metal structures and operating mechanisms

The metal structure and operating mechanism are one of the load-bearing and transmission components of the 20/5t bridge crane, and their safety and reliability have an important impact on the operating stability and carrying capacity of the crane. Therefore, it is necessary to conduct regular inspection and maintenance of the metal structure and operating mechanism. This includes inspection and evaluation of the strength, rigidity and stability of the metal structure; inspection and maintenance of components such as the transmission device, bearings and connectors of the operating mechanism. Through regular inspection and maintenance work, potential defects and problems can be discovered and dealt with in a timely manner to ensure the normal operation of the metal structure and operating mechanism and the safety of the crane.

Improve the safety awareness and operating skills of operators

The safety awareness and operating skills of operators are one of the important factors affecting the safety of 20/5t bridge cranes. Therefore, it is necessary to strengthen the safety education and training of operators to improve their safety awareness and operating skills. This includes regular safety knowledge training and operating skills training for operators; organizing operators to participate in safety drills and accident case analysis and other activities; encouraging operators to actively learn new safety knowledge and skills. By strengthening the safety education and training of operators, their safety awareness and operating skills can be improved, ensuring that they can strictly abide by operating procedures and safety requirements during the operation process, reducing accident risks and losses.