In the previous article, we introduced the installation standards for crane trolley rails. Those are only part of the crane rail installation standards. Today we introduce the crane trolley rail installation standards. The trolley track of the crane generally refers to the double-beam bridge crane or the double-beam gantry crane. Some of the installation standards are the same as those of the trolley . The general standards are as follows:
The straightness of the track can be checked by drawing a steel wire, that is, a 0.5mm steel wire is pulled on the car stop at both ends of the track, and then measured point by point with a plumb hammer, with an interval of about 2m.
The track elevation can be measured with a level gauge.
The span of the steel rail is checked with a steel tape measure. One end of the ruler is fastened with a clamping plate, and the other end is tied to a spring scale. The tensile force is 98N for the crane with a span of 10-19.5m, and 147N for the crane with a span of 22-31.5m. Measure once at an interval of 5m. , Make a punch in the middle of the rail before measurement, and the tension of the spring balance at each measurement point is the same.
To ensure that the track span is consistent with the crane span, when the track is installed, a special person must be assigned to accurately measure the distance between the two tracks with a steel pan ruler and a spring balance, and a tape measure cannot be used. In order to achieve the same installation height of the two tracks, the surface elevation of the concrete crane beam or steel beam must be measured with a level first. If the error is too large, please ask the civil construction unit to correct it. If the error is small, it can be adjusted with the pad when installing the track.
الاتصال لدينا كرين المتخصصين
أرسل لنا رسالة وسوف نقوم بالرد عليك في أقرب وقت ممكن.