Because of COVID-19, our engineers are unable to help overseas customers to install overhead cranes. In this case, we will provide customers with the most detailed installation instructions and provide online guidance. If we have local partners, we can also invite partners to guide the installation. Today we want to share the installation of a 10 ton overhead crane from the الفلبين
In order to fix the track of bridge crane, each track is connected one by one with splint, and then the rail is locked on the bearing capacity by pressing plate or bolt. At the same time, the track distance is measured to match the span of the crane beam. If there is any error in the bearing beam level, steel plate should be added to ensure the track installation level. AC speed regulation system generally adopts thyristor stator voltage regulation, energy consumption braking, eddy current braking, hydraulic push rod braking, multi speed motor and dual motor schemes. The capacity of the motor, resistor and other primary components of the speed regulation system should be selected and checked according to the actual working conditions. When the hydraulic push rod brake is used to improve the speed regulation of the tissue, the support brake should be provided.
نحن رافعة مصنع يقع في الصين ، توفير رافعة خدمات التخصيص العالمية رافعة العملاء. إذا كنت ترغب في تخصيص النفقات العامة رافعة, يمكنك ترك رسالة على الموقع أو البريد الإلكتروني: sales010@cranesdq.comقل لنا المعلومات التالية ، مدير المبيعات لدينا بالاتصال بك:
يمكنك إما ملء نموذج الاتصال أو مراسلتنا على البريد الإلكتروني. بعد تلقي استفسارك وسوف نتصل بك في أقرب وقت ممكن وتقديم عرض مناسب.
الاتصال لدينا كرين المتخصصين
أرسل لنا رسالة وسوف نقوم بالرد عليك في أقرب وقت ممكن.