Homeالأخبار → Lifting machinery periodic inspection report form

Lifting machinery periodic inspection report form

The lifting machinery used by the enterprise shall be inspected regularly and recorded in the form according to the regulations. The editor will introduce a collected periodic inspection form for your reference.

This form is compiled with reference to "TSG Q7015-2008 Periodic Inspection Rules for Lifting Machinery ".

Serial number Inspection items and content test result test results Remark
1 Technical document review (1) Periodic inspection reports and usage records
2 (2) Effective proof of lightning protection system
3 Inspection of main parts General condition (wear, deformation, defect)
4 Spreader (1) The suspension of the spreader
5 (2) Anti-decoupling device of hook
6 (3) Hook welding repair, cast crane hook mouth wear protection saddle
7 (4) Explosion-proof crane hook measures to prevent the hook from impact or friction
8 سلك حبل سلك حبل
configuration
(1) Wire rope matching
9 (2) Lifting hot and molten metal wire rope and its production license
10 (3) Explosion-proof crane to prevent the wire rope from slipping off the groove device
11 سلك حبل
fixation
(1) The wire rope end is fixed
12 (2) Rope end fixing device on the reel
13 (3) Metal pressed and fixed joints
14 (4) Wedge sleeves and wedges fixed by the wedge
15 (5) Installation and number of rope clamps when the rope clamp is fixed
16 Scrap of wire rope (1) The number of broken wires in the wire rope for hoisting machinery for lifting hot metal, molten metal or dangerous goods
17 (2) Broken wire of explosion-proof crane wire rope
18 Pulley (casting crane)
19 Rope guide
20 Electrical and control system inspection Electrical equipment and control functions (1) Electrical equipment and control functions
twenty one (2) Metallurgical, explosion-proof, and insulated crane electrical equipment and its components
twenty two
twenty three Short circuit protection of the main power circuit
twenty four Control power supply for the button panel (1) Control power supply safety voltage, button function
25 (2) The control cable support rope of the portable operation button panel
26 Safety protection and protective device inspection الفرامل Brake setting
27 Brake usage (1) Brake component defects, hydraulic brake oil leakage phenomenon
28 (2) The friction, defects and oil pollution of the brake wheel and the friction plate
29 (3) Brake adjustment and braking conditions
30 (4) Oil leakage of brake pusher
31 Lifting height (descent depth) limiter (1) Lifting height limiter
32 (2) Lifting height limiter of hot and molten metal lifting mechanism
33 (3) Tower and portal crane descending depth limiter
34 رفع الوزن المحدد (1) Settings
35 (2) Test
36 Buffer and stop device
37 الطاقة في حالات الطوارئ التبديل
38 Performance test No-load test (1) Running and braking conditions
39 (2) Operating conditions of the control system and electrical control system
40 (3) Rail gnawing phenomenon running along the full length of the track
41 (4) Working conditions of various safety devices
Inspection: Date: Inspection: Audit:

 

  الاتصال لدينا كرين المتخصصين


أرسل لنا رسالة وسوف نقوم بالرد عليك في أقرب وقت ممكن.

    ارسال الاحتياجات الخاصة بك

      arArabic