According to relevant national regulations, bridge cranes of more than 3 tons are required to be inspected after installation , and regular inspections are required in future use . The editor will share with you the acceptance process for regular inspections of under-bridge cranes.
The periodic inspection of lifting machinery includes procedures such as application, acceptance, periodic inspection, issuance of periodic inspection report and inspection mark:
1. Application
The lifting machinery user shall, in accordance with the periodic inspection requirements of the safety technical specifications, submit the periodic inspection requirements to the special equipment inspection and testing agency one month before the expiration of the safety inspection qualification.
2. Acceptance
After receiving the application for periodic inspection, the inspection and testing agency shall arrange the inspection in a timely manner in accordance with the requirements of the safety technical specifications and notify the applicant; if the inspection conditions are not met, the reason shall be explained.
3. Periodic inspection
During the on-site inspection, the lifting machinery inspected unit, maintenance and other related units shall arrange for relevant professionals to go to the site to cooperate with the inspection and provide relevant technical information to the inspection agency:
(1) Materials such as equipment registration and operation management system;
(2) Equipment technical files;
(3) Maintenance, routine inspections and records of failures and accidents, etc.
The inspection and testing agency shall arrange for inspection and testing personnel who meet the specified requirements to conduct regular inspections.
The periodic inspection of lifting appliances is carried out in accordance with the " Regulations for Periodic Inspection of Lifting Appliances ".
Enterprises using cranes should pay attention to the application time limit when applying for periodic inspections:
1. The lifting machinery user shall submit an inspection application to the inspection and testing agency one month before the expiration of the safety inspection qualification period;
2. After receiving the inspection application, the inspection agency shall arrange the inspection within the validity period of the certificate;
3. After the inspection (re-inspection) is completed, an inspection (re-inspection) report should be issued within 7 working days;
4. When the inspected unit has any objection to the inspection result, it may submit it to the supervisory inspection agency in written form within 15 days from the date of receipt of the inspection report. The supervision and inspection agency shall give a written reply to the objection raised by the accepting unit within 15 working days.
In the process of using the bridge crane, the enterprise should do a good job in the maintenance of the crane, and keep the relevant documents of the crane, so as to avoid the lack of relevant documents during the inspection and affect the process.