QE general purpose overhead crane is designed and manufactured according to GB/T 14405 general purpose bridge crane. It mainly adds a winch trolley to the QD type crane to prevent the swaying when lifting and transporting long or wide goods. Its lifting capacity is generally 5t+5t-100t+100t. The applicable span is 10m-50m. The working environment temperature is within the range of -20-+40 degrees.
QE general purpose overhead crane application scope: suitable for lifting long materials (pipe piles, electric poles, wind power poles, wood, paper rolls, pipe fittings, bars) in workshops or open-air warehouses of factories and mines.
Advantages and disadvantages of QE double hook overhead crane
- Advantages: high working level, good stability and safety, low failure rate, speed parameters can be changed according to user requirements.
- Disadvantages: long order cycle, high price, relatively large size, relatively large installation size required for the factory.
This crane has three operating modes for users to choose: ground, control room and remote control.
Design drawing of QE double hook bridge crane
Technical parameters of QE double hook overhead crane
رفع القدرات |
5t+5t |
10t+10t |
20t+20t |
32t+32t |
50t+50t |
100t+100t |
Basic Data |
Span |
5m-50m |
رفع الارتفاع |
6m-100m |
Service Class |
A5~A6 |
وضع التحكم |
Ground handle + wireless remote control + cab control |
إمدادات الطاقة |
3AC, 50Hz, 380V |
رافعة السكك الحديدية |
18kg/m |
24kg/m |
38kg/m |
43 كجم/م |
50 كجم/م |
118kg/m |
السرعة |
سرعة الرفع |
12m/min |
8.6m/min |
7.2m/min |
6.2m/min |
5.3m/min |
4m/min |
Trolley Speed |
20m/min-60m/min |
Bridge Speed |
30m/min-100m/min |