Operation and maintenance rules of electric hoist for cantilever كرين زينة

① The electric hoist of new equipment or equipment after disassembly and inspection should first be tested for several times with empty vehicles. But before the end of the equipment, do not try to turn on the power;

②Before the normal operation of the cantilever crane, a static load test should be carried out with an additional load of 125%, lifting about 100 mm from the ground, and a 10-minute static load test to check whether it is normal;

③ The dynamic load experiment is to perform repeated lifting and moving left and right experiments with additional load components. After the experiment, check whether the mechanical transmission part, the electrical part and the connection part are normal and reliable;

④. In use, it must be prevented from being used in an environment that is not allowed, and beyond the additional load and the additional number of closings per hour (120 times);

⑤. During equipment debugging and maintenance, it is necessary to strictly check whether the limit equipment is sensitive and reliable. When the hook is raised to the upper limit position, the distance between the hook shell and the reel shell needs to be greater than 50mm (10t, 16t, 20t requirements are greater than 120mm). When the hook is lowered to the lower limit position, the safety circle of the wire rope on the drum should be ensured, and the useful safety circle must be more than 2 circles;

⑥ It is not allowed to press two flashlight door buttons that make the electric hoist move in the opposite direction together;

⑦. After the work is over, the main gate of the power supply needs to be opened to block the power supply;

⑧. The electric hoist should be operated by a special person, and the operator should fully grasp the safe operation regulations, and it is strictly forbidden to pull the inclined crane;

⑨. Special personnel are required to check the electric hoist regularly during operation, and take measures when faults are found, and record them carefully.