Home → News

Disadvantages of a Built Up Hoist

Cost would be the biggest disadvantage to specifying a built up hoist into an overhead crane system. The cost factors into the equation in many ways: Only compatible with top running double girder cra[...]

What is Arch Beam and Why is it So Dangerous on an Overhead Crane?

Arch beams, window track, zipper track, serrated track, or castellated beams…whatever you choose to call them, you need to be aware of what they are, and why they’re considered dangerous if they[...]

Purchasing an Overhead Crane Process: From Consultation to Installation

If you’ve determined that your business can benefit from the installation of a new overhead crane system, then you’re probably in the beginning stages of researching companies who make or build ov[...]

What is Energy Chain Electrification

Energy chain, also commonly referred to as power chain, is a versatile and flexible method of running electrical or data cable to a piece of equipment or machinery. Energy chain can be used with vario[...]

How Did Energy Chain Start Getting Specified on Overhead Crane Equipment

On this mobile gantry crane, energy chain is being used to run power and control cable to the hoist and the bridge. The number of applications energy chain can be used for are almost unlimited, but it[...]

Advantages of Using Energy Chain on an Overhead Crane System

Efficient Design Most importantly, energy chain offers a simple clean design and a simplified installation. It’s really just a matter of attaching the trough to the main girder of the crane. From th[...]

Are There Disadvantages to Using Energy Chain Electrification?

On most crane systems, the cost of implementing an energy chain electrification system can be higher upfront than a traditional festoon, conductor bar, or cable reel system. Traditional electrificatio[...]

Overhead Crane Electrification for Harsh Environments

Energy Chain: Overhead Crane Electrification for Harsh Environments Does your job depend on maintaining the equipment in your facility to keep production up and running? Do you have overhead cranes op[...]

Testing the New Overhead Crane System

Once the overhead crane installation is complete, the installers will test the functionality of the new overhead crane system and also perform a rated load test. OSHA 1910.179 Overhead & Gantry Cr[...]

What Structural Considerations Affect the Design of the Crane?

A bridge crane can be supported by the roof/ceiling, a freestanding support system, or can be tied back to the existing building supports. In an existing building structure, you have to have a clear u[...]

Send Your Needs

    en_USEnglish