Home → Forum
Consideration For C...
 
Notifications
Clear all

Consideration For Crane Delivery And Installation

1 Posts
1 Users
0 Likes
524 Views
(@martina-foster)
Active Member
Joined: 2 years ago
Posts: 4
Topic starter  

The crane is used more and more, its advantages are also well known by all of users, not only from the safety of the product, but also its simple and convenient operation, safe and comfortable use, etc. At the same time, we are also more and more concerned about the safety of crane installation, especially the user and the factory. Below we have collected some of the things that need to be noticed in the installation process.

Crane belongs to the special equipment, whose installation needs the professional personnel with relevant certificates, otherwise it will be forbidden and punished by the technical supervision departments.

There are a lot of matters need to be noticed when crane is installed, for example, reasonable arrangements and plans to install not only can save a lot of time, but also improve the efficiency of crane installation work. So the installation and acceptance of crane must be in accordance with Crane safety procedures, Standard of construction safety inspection(JGJ59-99)and crane operation instruction, and be combined with the actual situation of the construction unit itself to install the crane with a strict, careful and orderly way. Now, we will discuss the problem of crane installation and other relevant contents of the crane inspection and acceptance.

First of all, when the crane is shipped, the problem of ultra wide and ultra high must be to taken into account. The transfinite formalities should to handled in advance if there is a need, in order to avoid the delivery time being delayed due to unable go through the formalities of transfinite.

Secondly, installation procedures must be handled at technical supervision department of the installation location before the crane is installed. This is a necessary process, so it’s need to be done in advance before the crane is shipped in order to avoid the weekends, otherwise it will affect the crane be installed according to the plane.

Then, make a detail plane to delivery products to customer and handle inspection procedures, these are also very important, which are the prerequisite related to the crane can be installed smoothly.

Another point need to be noticed is that there maybe need a truck crane to help handle the crane unload and installation when it is transported to the construction site, which is also need to prepared in advance. so make a good plan that do not delay the normal use as far as possible, also don’t let the car idle to achieve the rational utilization, reduce unnecessary spending and waiting time.

After installation, only when the crane was debugged on-site and tested qualified can it be put into use. The crane installation will be checked strictly item by item before acceptance by the construction unit departments, the security department etc. At the same time, carry out technical inspection, no-load test, load test, to ensure the safe use of crane. Farther more, regular maintenance and safety of the special inspection is still very important and essential. It is also essential to do regular and irregular maintenance, security special inspection, especially for the weight limiter, wire rope, pulley, rope and other key parts inspection, in order to ensure the performance is good after crane installation, without fault, and can operate safely.

Above points are the most important and basic problems about crane installation, making these plans not only can improve the work efficiency, but also avoid some unnecessary expenses. On the other hand, the acceptance inspection is also an indispensable process, which is related to the use and security of cranes.


   
Quote
Share:

Send Your Needs

    en_USEnglish