Inicio → Foro
ES80 50 t Mucking C...
 
Avisos
Vaciar todo

ES80 50 t Mucking Crane provides solutions for the construction of Cross River Rail

1 mensajes
1 users
0 likes
759 views
(@craig-minns)
Trusted Member
Registrado: hace 2 años
Respuestas: 0
Topic starter  

The latest ES80 50 t Mucking Crane packed with heaps of safety features through 23 yrs working with CPB Engineers creating a purpose built hoist with 100 % braking redundancy, man riding safety with safety circuits to AS1418 and more. One of two we are supplying for Cross River Rail Brisbane project.

ES80 50t Mucking Crane

ES80 50 t Mucking Crane

Este debate ha sido modificado el hace 1 año por Los ciervos

   
Citar
Compartir:

Enviar A Tus Necesidades

    es_ESSpanish