One end of the bridge girder of the semi-grúa de pórtico is directly supported on the track, and the other end is supported on the track by outriggers.
The semi-gantry crane is a kind of crane between the bridge crane and the gantry crane. The semi-gantry crane has only one leg, and the other end of the crane is mounted on the crane beam of the factory building like a bridge crane. The track is commonly known as the sky track, and the track on the ground is called the ground track. The hoisting mechanism, trolley running mechanism and bridge structure of the semi-gantry crane are basically the same as the bridge crane. Due to the large span, the operating structure of the crane mostly adopts a separate driving method to prevent the crane from being skewed and increasing the number of groups, or even accidents. crane rail clamps.
If you need to customize a Grúa pórtico de 10 toneladas or a 5 tonelada grúa de pórtico, you can send your requirements to my email: nina@maikutou.com