It is rely on the bridge frame along the workshop orbital direction moving longitudinal, the trolley along the main beam
direction moving transverse and the hook lifting movement to work. High lifting capacity of this crane is designed with two hooks that means two independent sets of hoisting mechanism. The main hook is used to lift heavy objects while the auxiliary used to lift light objects,the auxiliary can also be used for collaborative main hook tilting or tipping the material. However, don’t use the two hooks to lift at the same time when goods weight is over the auxiliary rated capacity.
Mecanismo de
|
Elemento
|
Unidad
|
Resultado
|
|
Elemento
|
|
|
||
Capacidad de elevación
|
tonelada
|
5-32t
|
||
Altura de elevación
|
m
|
6-30
|
||
Span
|
m
|
7.5-25.5
|
||
Working environment temperture
|
°C
|
-25~40
|
||
Velocidad
|
Main Hook
|
m/min
|
3(0.3/3)-8(0.8/8)
|
|
|
Auxiliary Hook
|
|
7(0.7/7)-8(0.8/8)
|
|
|
Crab
|
|
20
|
|
|
Trolley
|
Suelo
|
|
20 30
|
|
|
Room
|
|
30 40 45
|
Sistema de trabajo
|
|
A3-A5
|
||
Fuente de alimentación
|
|
three-Phase A C 50HZ 380V
|