Because of COVID-19, our engineers are unable to help overseas customers to install overhead cranes. In this case, we will provide customers with the most detailed installation instructions and provide online guidance. If we have local partners, we can also invite partners to guide the installation. Today we want to share the installation of a 10 ton overhead crane from the Filipinas
In order to fix the track of bridge crane, each track is connected one by one with splint, and then the rail is locked on the bearing capacity by pressing plate or bolt. At the same time, the track distance is measured to match the span of the crane beam. If there is any error in the bearing beam level, steel plate should be added to ensure the track installation level. AC speed regulation system generally adopts thyristor stator voltage regulation, energy consumption braking, eddy current braking, hydraulic push rod braking, multi speed motor and dual motor schemes. The capacity of the motor, resistor and other primary components of the speed regulation system should be selected and checked according to the actual working conditions. When the hydraulic push rod brake is used to improve the speed regulation of the tissue, the support brake should be provided.
Somos un fabricante de grúas encuentra en China, proporcionando grúa servicios de personalización global de la grúa clientes. Si desea personalizar una Grúa, usted puede dejar un mensaje en el sitio web o Correo electrónico: sales010@cranesdq.com, nos diga la siguiente información, y nuestro gerente de ventas se pondrá en contacto con usted:
Usted puede llenar el formulario de contacto o envíenos un correo electrónico. Después de recibir su consulta, nos pondremos en contacto con usted tan pronto como sea posible y proporcionar usted con una oferta adecuada.
En contacto con nuestros especialistas de la grúa
Envíenos un mensaje y nos pondremos en contacto con usted tan pronto como sea posible.