5T general bridge crane is sold from China to the Philippines
The general bridge crane is a kind of crane used in ordinary scenes. Recently, we received an order from the Philippines. Guests hope to customize a 5-ton bridge crane, which will be applied to a small mine.
Why choose general bridge crane
The general bridge crane can be used in general machining and assembly workshops. For small mines, it can meet the needs of daily work. Our bridge crane has the advantages of good workmanship and long service life, which makes our Philippine guests very satisfied
Application scope of general bridge crane
This product is applicable to the working environment of - 25 ℃ ~ + 40 ℃, humidity ≤ 85%, altitude below 1000m, and the applicable power supply is three-phase AC 380V and 50Hz (it can also be customized according to customer requirements).
Specification of 5t general bridge crane
- Capacité de levage: 5T
- Span: 10.5m
- Le niveau de travail: A5
Description of hoisting mechanism of 5ton general bridge crane
- Single hook is a set of independent driving device. When there are two main and auxiliary hooks, two sets of lifting mechanisms driven independently are installed.
- The lifting mechanism is driven by the high-speed rotation of the special motor for YZR crane and the involute gear reducer is driven by the gear coupling. The low-speed shaft of the reducer rotates the drum wound with steel wire rope. As long as the motor and forward and reverse rotation are controlled, the lifting function of the hook can be achieved.
- In order to ensure the safety and reliability of the lifting mechanism, a brake is installed on the high-speed shaft of the reducer. An overload limiter is installed on the bearing seat at one end of the supporting drum to prevent overload of the lifting load.
To ensure you pick the best solution for your job, be sure keep the following factors in mind:
- Number of tons to be moved.
- Distance to be moved.
- Maximum lift height required.
- Necessary below-the-hook devices (magnets, grab, grab bucket, etc.)
- Amount of cycle time needed (working time).
No matter the crane application or weight required, Dongqi Group provide safe, efficient load management with solutions. Contactez-nous today to discuss how our scrap removal cranes can help with your next project E-mail: sales010@cranesdq.com.
Les Vues Post: 672