Did you recently purchase a new manual hoist or trolley for your facility? Have you recently repaired your current hoist or trolley?
If the answer to either of those questions is yes, did you know your work before putting that equipment into use is just getting started?
According to standards set forth by the American Society of Mechanical Engineers (ASME) and Crane Manufacturers Association of America (CMAA), you need to load test any new or altered hoists and trolleys before beginning or returning the gear to service.
In this article, we’ll outline the following things you need to know before using your manual hoists or trolleys:
Our specialists have found end-users battling confusion over this topic. Often, we hear the question: “If I buy a hoist and trolley that’s already been tested by the manufacturer, and then, put it on a structure that’s already been tested, is it still required to be tested again?”
The short answer is yes because it’s a reinstallation. Anytime you remove or reinstall a hoist, it must be load tested again, according to ASME B30.17 Cranes and Monorails (With Underhung Trolley or Bridge).
This topic is one our trainers focus on with customers. Anytime you do any major work on a load-bearing component, which is going to be the trolley bolts and everything that holds it to the overhead beams, you have to conduct a load test.
The confusion comes because of maintenance applications where they’re using a hand chain hoist or come along, and it’s not left in place at all times. They may pull a motor or gearbox using a monorail system that’s been tested and certified.
While the monorail system has been tested and certified, the trolley and chain falls need to be after they’re installed. Although they’re certified, end-users need to have the whole system recertified before returning to service.
That leads to confusion because it’s a lifting application, and not a crane.
Recently, our lifting specialists ran into this problem when a customer had “a one-off maintenance operations” adjustment. The customer asked, “Do I have to load test this monorail again?”
According to the standards, the monorail has to be load tested, as do the trolley and the hoist. Even if they’ve been load tested by the manufacturer, they need to be load tested again once installed at the place of operation.
The Crane Manufacturers Association of America, Inc.’s Crane Operator’s Manual (CMAA Specification No. 79 – 2020) textbook states anytime you’re installing, reinstalling, or repairing any type of hoist onto a crane system, you’re required to do a load test.
A competent person, as long as they’re capable of doing the install.
Not only do they need to be competent in doing the load test, but they must understand what you’re looking for during the test. Then, they need to do the reinspection after the load test, to check for deflection and make sure the brakes are holding.
OSHA defines a Competent Person as:
“One who is capable of identifying existing and predictable hazards in the surroundings, or working conditions which are unsanitary, hazardous, or dangerous to employees, and who has authorization to take prompt corrective measures to eliminate them (OSHA 29 CFR 1926.32(f)).”
Of course, there are more questions and some ambiguity when reading this definition of a competent person, but certainly two words stand out — “capable” and “authorized.”
One of the questions you may ask is, “what makes someone capable, and how do you authorize them to take corrective actions?” Competency is demonstrated by a person’s knowledge, skills, experience, and training — not by successfully completing training programs or evaluations.
It’s the employer’s responsibility to designate a competent person on a job site or in a facility. In the world of lifting and rigging, a competent person performs the inspections of lifting slings and rigging hardware, prior to each shift or each lift. This person has demonstrated to their employer that they have the ability to recognize hazards, and have been deemed competent.
Le ASME B30.17 Cranes and Monorails (With Underhung Trolley or Bridge) states all newly installed cranes shall be tested.
That’s an actual requirement, and manual trolleys must be load tested prior to first use as part of the initial inspection.
Under Section 17-2.2 of the ASME B30.17 Cranes and Monorails (With Underhung Trolley or Bridge) standard, “New, reinstalled, altered, repaired, and modified cranes and monorail systems shall be tested by a designated person prior to initial use to confirm that the equipment performs in compliance with the provisions of this Volume.
“Tests shall include, as applicable, the following functions:
“New, reinstalled, altered, repaired, and modified equipment should be load tested prior to initial use as determined by a qualified person. Load testing of altered, repaired, and modified equipment may be limited to the functions affected by the alteration, repair, or modification, as determined by a qualified person.
“The replacement of load chain and rope is specifically excluded from this load test. However, an operational test of the hoist shall be made in accordance with ASME B30.16 Overhead Underhung and Stationary Hoists prior to putting the crane or monorail system back in service.
“If a load test is conducted, the load shall be not less than 100% nor more than 125% of the rated load of the crane or monorail system, unless otherwise recommended by the manufacturer or a qualified person. If a load test is conducted, the person conducting the load test shall prepare a written report of the load sustained during the test and the operations performed during the tests. Reports shall be placed on file.”
“Hoists shall be load tested per ASME B30.16 Overhead Underhung and Stationary Hoists.”
New hand-chain-operated hoists shall be load tested by the manufacturer using the method specified in para. 16-2.2(a)(1) with a test load of not less than 125% of the rated load. If load testing of the hoist cannot be performed by the manufacturer, the user shall be notified and the load test shall be accomplished at another location or job site, by or under the direction of a designated person, prior to the hoist being placed in service.
Hoists in which load-suspension parts have been altered, replaced, or repaired should be statically or dynamically load tested as determined by a qualified person. If a qualified person determines that a load test is required, the load test shall be performed.
If a load test is conducted, the load test shall be conducted by or under the direction of a designated person. Lifting and lower functions shall be tested. (Testing through complete rated lift length is not required).”
According to the standard, any load test “shall not be less than 100% of the rated load of the hoist or more than 125% of the rated load of the hoist unless otherwise recommended by the hoist manufacturer or a qualified person.”
If a load test is conducted, the person conducting the load test shall prepare a written report of the load sustained and the operations performed during the test. Reports shall be placed on file.”
The replacement of load chain is specifically excluded from this load test. However, an operational test of the hoist should be made in accordance with para. 16-2.2.1(a)(2) prior to putting the hoist back in service.”
Complete new electric-powered or air-powered hoists shall be dynamically load tested by the manufacturer using the method specified in paras. 16-2.2.1(b)(1) and (b)(2) with a test load of not less than 125% of the rated load. If testing of the hoist cannot be performed by the manufacturer, the user shall be notified and the load test shall be accomplished at another location or job site, by or under the direction of a designated person, prior to the hoist being placed in service.
Hoists in which load-suspension parts have been altered, replaced, or repaired should be statically or dynamically load tested as determined by a qualified person.
If a load test is conducted, the load test shall be conducted by or under the direction of a designated person.
Lifting and lowering functions shall be tested (Testing through complete rated lift length is not required). Operation of brake(s) shall be tested.
If a load test is conducted, the test load shall not be less than 100% of the rated load of the hoist or more than 125% of the rated load of the hoist unless otherwise recommended by the hoist manufacturer or a qualified person.
If a load test is conducted, the person conducting the load test shall prepare a written report of the load sustained during the test and the operations performed during the test. Reports shall be placed on file.
The replacement of load chain or rope is specifically excluded from this load test; however, an operational test of the hoist should be made in accordance with paras. 16-2.2.1(b)(1), (b)(2), and (b)(3) prior to putting the hoist back in service.
Test anchorages or suspensions shall be approved by a qualified person.
Deflection is the degree to which a beam actually bends or displaces while under a load.
The acceptable range for deflection is a calculation based on the span distance of the overhead crane.
It varies depending on the type of structure, including:
Acceptable deflection comes down to the plans of the crane manufacturer and engineer. They should list the deflection allowance in their manuals. As an operator, it’s your responsibility to read and understand the deflection allowance level of your crane, and make sure you’re staying in that range.
According to ASME B30.17 Cranes and Monorails (With Underhung Trolley or Bridge):
“All inspections shall be performed by a designated person in accordance with the manufacturer’s recommendations and with the requirement of this Volume. Any deficiencies identified shall be examined and a determination made by a qualified person as to whether they constitute a hazard and whether disassembly or a more detailed inspection is required.”
While trolleys are not specifically listed in the initial, functional test, or frequent inspections, they’re included in the periodic inspections section.
During a periodic inspection, specialists will look for excessive wear of trolley(s), end truck guide wheels, trolley adjustments, and tolerances to manufacturer specifications.
Additionally, trolley travel will be included in operational tests.
According to ASME B30.16 Overhead, Underhung, and Stationary Hoists:
All inspections shall be performed by a designated person in accordance with the manufacturer’s recommendations and requirements of this Volume. Any deficiencies identified shall be examined and a determination made by a qualified person as to whether they constitute a hazard, and, if so, what additional steps need to be taken to address the hazard.
“The intervals shall be determined by a qualified person based on intended operating conditions and their effects on critical hoist components.”
“Prior to initial use, all new, altered, or modified hoists shall be inspected to verify compliance with the applicable provisions of this Volume.
Visual inspection with records aren’t required, but they must be performed before the first use of each shift.
During these inspections, the designated person needs to inspect:
Visual examinations with records aren’t required, but they must be done:
During these inspections, the designated person needs to inspect:
Visual inspection must be done with records of external conditions to provide the basis for a continuing evaluation. An external coded mark on the hoist is an acceptable identification in lieu of records.
These inspections should be done:
During periodic inspections, the designated person needs to inspect the following components:
***Remember, frequent inspections can be done by an in-house competent person. Periodic inspections need to be done by a third-party rigging inspection company.
By reading this piece, you now have a better understanding of:
Currently, CMAA recommends doing a load test on a periodic basis of three to four years.
However, if you’re doing some type of severe modification to or upgrade any load-bearing components, you’ll need an additional load test to recertify that assembly. If you’re putting on a new load chain, you’re going to have to redo your load test.
Those are qualifying events, but interpretation of CMAA standards say a load test is necessary for critical load-bearing components.