AccueilNews → What are the operation safety technologies of the lifting mechanism of bridge crane?

What are the operation safety technologies of the lifting mechanism of bridge crane?

(1) Smooth lifting. Before goods hoisting, after the steel wire rope is straightened, the hoisting object, lifting appliance and surrounding environment are inspected before hoisting. When lifting, lift the object at low speed, and then operate the controller to shift gears according to the gear. The conversion time of each gear can be 1 ~ 3S; The switching time of large crane is 6 ~ 18S. When starting, the more frequently the gear is operated, it is strictly prohibited to push it quickly. Avoid lifting objects that collide with surrounding personnel and equipment or breaking of steel wire rope, resulting in personal or equipment accidents. Do not lift the hook when it rotates to prevent the wire rope from leaving the wharf.

(2) After the lifting object rises, it generally moves to the lifting channel 0.5s higher than the highest equipment on the ground, and then rises along the channel. Accidents shall not be prevented by ground personnel or equipment. When the suspended object needs to pass through the space above the ground personnel position, the driver must constantly send escape signals to the ground personnel before driving. Tower crane

(3) Double hook crane shall not hang two items at the same time. The inoperative hook must be raised to the height of the specified position, and the rope shall not be hung on the hook. When each hook works alone, it can only lift objects that do not exceed the rated lifting capacity. Under special circumstances, when two hooks work together, the weight of the object shall not exceed the lifting weight of the main hook. When replacing the main hook and auxiliary hook, and the two hooks are similar in height, only one hook can be used separately to avoid collision between the two hooks.

(4) When lifting an object each time, the hook head (object selection equipment) shall be aligned with the center of gravity of the object, or the weight and center of gravity of the object shall be correctly estimated, and the hanging hook and hook shall be adjusted to an appropriate position. The left and right hooks are consistent. The car is moved to the left and right according to the left and right oblique hooks of the steel wire rope. Therefore, the hook is suspended with the center of gravity of the suspended object. Align the hook back and forth. According to the tightness of the rope buckles on both sides of the hanging object, the trolley can move forward and backward, and the tension of the front and rear ropes is the same, that is, the front and rear hooks are aligned. Crane with lifting mechanism and crane with two lifting mechanisms

Factory-Direct-Supplied-2ton-Ld-Model-Top-Running-Bridge-Crane

  Contactez nos spécialistes de la grue


Envoyez-nous un message et nous reviendrons vers vous dès que possible.

    Envoyer À Vos Besoins

      fr_FRFrench