According to the " Regulations on Periodic Inspection of Lifting Machinery ", the first inspection refers to the self-inspection of the lifting machinery user unit, and the inspection agency shall conduct the inspection of the lifting machinery that does not carry out installation supervision and inspection in accordance with this rule, before putting it into use. Inspection.
Nomor seri | category | Variety | Komentar |
1 | Jembatan derek | Electric single beam crane | - |
2 | Mobile crane | Tire crane | - |
3 | Crawler crane | - | |
4 | Container reach stacking crane | - | |
5 | Railway crane | - | |
6 | Cable crane | - | See note A-1 |
7 | Mast crane | - | See note A-2 |
8 | Gantry crane | Rubber-tyred container gantry crane | Refers to the factory in the form of roll-on-roll packaging (see Note A-3) |
9 | Rail-mounted container gantry crane | ||
10 | Quayside container crane | ||
11 | Loading and unloading bridge (referring to unloading general machine) |
Note A-1: Cable cranes include fixed cable cranes, swing cable cranes, translational cable cranes and
radial cable cranes.
Note A-2: Mast cranes include fixed mast cranes and mobile mast cranes.
Note A-3: The hoisting machinery that is shipped from the factory in roll-on-roll form refers to the hoisting machinery that will not be disassembled after being energized and debugged in the factory, and will be transported as a whole to the
site of use without reassembly.
During the first inspection of the crane, the metal structure, spreader, wire rope, and various safety devices of the equipment will be inspected. And we will provide customers with relevant materials such as manufacturing licenses, certificates of conformity, etc., which are required for inspection, and we can also provide customers with inspection services, which can save customers' time.