On January 18, 2008, the SANY SCC9000 crawler crane, once known as the “first crane in Asia”, came out in Kunshan SANY Industrial Park, and simultaneously promoted this new “favorite” of crawler cranes to the world. The maximum lifting capacity is 900t, which is the largest and largest tonnage crawler crane in Asia at that time. The equipment not only has excellent lifting performance and first-class overall machine stability, but also has a fully enclosed hydraulic system design, 100kg-level high-strength materials and a large number of The adoption of new technology is the first time in China and leading in Asia.
SCC9000 simple parameters:
Over-lift working condition of main boom belt: Maximum lifting weight: 900t;
Main boom length: 42~120m;
Maximum lifting moment: 13498t·m;
Rope speed of main winch: 0~120m/min;
Walking speed: 0~1.1km/h;
Construction case and application conditions:
Sany SCC9000 crawler crane adopts the LJDB working condition with 60m main boom, 48m jib, and 58m operating radius, which perfectly completes the hoisting operation of the nuclear island dome of Unit 1 of Fujian Ningde Nuclear Power Plant. This operation is the world's first use of a crawler crane produced in China for the lifting of critical components for nuclear power construction.
SANY SCC9000 crawler crane scored twice and successfully hoisted the nuclear island dome of the nuclear power plant again. For this hoisting, the Sany SCC9000 crawler crane adopts the LJDB working condition with 60m main boom, 48m jib, 24m overlift radius, and 52m operating radius. The No. 2 nuclear island dome of unit 2 with a weight of 143t, a height of 11m and a diameter of 37m is hoisted to 52m. The seating height is perfectly placed on top of the nuclear island shell.