Crane duty classifications of China

Crane use level shows that the crane used frequently during the entire design life, According to the design life period general work cycle number N is divided into ten levels (see table 1).
Table 1:

Crane use level general work cycle number N annotation
U0 1.6*10­4

Not often use

U1 2.2*104
U2 3.3*104
U3 1.25*105
U4 2.5*105

Free to use

U5 5*105

Often secondary to use

U6 1*106

Don't always busy to use

U7
U8
U9
2*106
4*106
>4*106