Shipbuilding Gantry Crane

Shipyard gantry crane is a kind of gantry crane with large lifting capacity, large span, high lifting height, multi-functional and high efficiency, which is specially used for the segment transportation, head-to-tail docking and overturning operation of large ship hulls. With the development of large shipbuilding industry, shipyard gantry cranes for sale, the demand for shipyard gantry cranes is growing rapidly.

Price:BUILT CUSTOM - CALL FOR QUOTE

* The current page price is for reference only. Add to cart and submit to get the latest price

Detail


Additional information

80t 100t 150t 200t 300t 400t 500t Shipbuilding Gantry Crane

The shipbuilding gantry crane is a special lifting equipment that works on the dock, slipway or platform of the shipyard to carry out the lifting and turning over of the hull sections.

With the development of large-scale shipbuilding industry, the sales of shipyard gantry cranes and the demand for shipyard gantry cranes are growing rapidly. Compared with traditional gantry cranes, large shipyard gantry cranes have obvious advantages in the installation and transportation of hull sections.

It spans the dock (berth) and can provide on-site assembly services on the dock coverage surface. It not only has the functions of lifting and horizontal transportation, but also can realize the aerial flipping of the hull and adjust the sections to the necessary position for ship welding.

Rail-mounted Shipyard Gantry Crane

Rail-mounted Shipyard Gantry Crane Parameter

Rail-mounted Shipyard Gantry Crane

Rubber-tyred Shipyard Gantry Crane

Rubber-tyred Shipyard Gantry Crane Parameter

Rubber-tyred Shipyard Gantry Crane

200 Ton shipbuilding gantry crane in shipyard

Shipbuilding gantry crane 200 ton is a kind of lifting equipment with large span, large lifting capacity, multifunction and high efficiency, specialized in section transport, docking and turnover of hull in shipyard or slipway.

200 Ton shipbuilding gantry crane in shipyard

Shipbuilding gantry crane 200 ton mainly consists of main girder, rigid leg, flexible leg, upper and lower trolley, maintenance jib crane, crane travelling mechanism and electrical control.

Shipbuilding gantry crane components

Shipbuilding gantry crane 200 ton achieves the turnover of hull through the cooperation of two trolleys. First, upper trolley bear the whole weight of hull through the adjustment of the position of hook(Fig.1), and lower trolley pass under the upper trolley. The hook is retied to another side of hull(Fig.2). Second, upper one will give up the hook, and Upper and lower one go on reverse running and then finish the turnover of hull(Fig.3).
Working diagram of shipbuilding gantry crane

Main technical parameter:

Item Unit 150t-82m 200t-94m 320-122m 800t-160m
Rated lifting capacity t 150 200 320 800
Span m 82 94 122 160
Axle Base m 20 24 30 35
Upper Trolley capacity t 2×75 2×100 2×160 2×440
hoisting speed m/min 0.2~5~8~10 0.2~5~10 0.15~6 0~8~20
traversing speed m/min 1~25 0.6~20~30 0.3~30 0~40
Lower Trolley capacity t Main120/Aux20 Main150/Aux30 Main200/Aux20 Main450/Aux30
hoisting speed m/min main0.2~5~8~10/
aux18
main0.2~5~10/
aux0.2~10
main0.15~6/
aux0.2~20
main0~8~20/
aux16~32
traversing speed m/min 1~25 0.6~20~30 0.3~30 0~40
Lifting Height Upper Trolley m above rail top58/
below rail top12.5
above rail top60/
below rail top6
above rail top75/
below rail top9
above rail top73
below rail top16
Lower Trolley Main m above rail top75
below rail top13.3
Lower Trolley Auxiliary m above rail top76
below rail top 13.3
Traveling speed m/min 1~30 0.6~30 0.4~30 0~45
Wheel load KN ≤420 ≤520 ≤750 ≤750
Weight t 1066 1520 2980 4000
Total power KW 650 790 1110 3500
Power supply \ AC10kV 50Hz AC10kV 50Hz AC6kV 50Hz AC10kV50Hz