Home → Posts tagged "Power Industry

The bridge crane of the waste incineration power plant needs to be equipped with an anti-sway system

Customized bridge cranes can better adapt to complex working environments and play a positive role in improving work efficiency. The case that Dongqi Crane will share today is one of the world's leadi[...]

UK Combined Cooling, Heat and Power power plant purchases grab bridge crane to handle wood chips

The workflow of the combined cooling, heating and power power plant is based on the comprehensive utilization of energy, aiming to achieve cascade utilization of energy and improve energy utilization [...]

What should we do if we install a bridge crane for a nuclear power plant?

As with most crane installation projects, few projects are exactly alike. Many times it is necessary for the crane company to fully communicate with the customer to clearly understand the customer's s[...]

Power Industry

As a company with profound technological accumulation, Dongqi Crane has always been at the forefront of crane technology. We are driven by innovation, constantly developing and launching material hand[...]

A dockside gantry crane and crawler to work in tandem

A Modulift spreader bar was used to allow a dockside gantry crane and crawler to work in tandem. For a job lifting 750t monopiles at the port of Cuxhaven, Schmidbauer used the port’s own gantry cran[...]

Maintenance and repair cranes for a vast underground cavern at the Hulu Terengganu Hydroelectric Project

MHE-Demag recently supplied maintenance and repair cranes for a vast underground cavern at the Hulu Terengganu Hydroelectric Project. The company secured a contract to supply two units of 150t/25t/5t [...]

Vinalift power plant gantry crane celebrates second anniversary

This is an 80-ton double girder gantry crane at the Thai Binh 1 thermal power plant in Vietnam. Designed, manufactured and supplied by Vietnam Steel Structures and Lifting Equipments (Vinalift) and cu[...]

Mammoet completes removal and replacement of a first steam generator in France

Mammoet completes removal and replacement of a first steam generator in France. Five years after Mammoet was first approached by French nuclear power company Framatome to assist with the removal and r[...]

Eurocrane (Asia) was contracted to supply and install the powerhouse crane for the plant

The Naresuan Dam was built between 1976 and 1985 to control the flow of the Nan River north of the city of Phitsaulok in Thailand. As part of its strategy to increase clean power generation, the Thai [...]

Jaso Industrial Cranes has supplied equipment for three stages of the hydropower complex in Guatemala

Jaso Industrial Cranes has supplied equipment for three stages of the hydropower complex in Guatemala, starting with Renace II, completed in 2011, and continuing today with Renace IV. Four hydro-elect[...]

Send Your Needs

    en_USEnglish