This on demand solution is a complex elevation and transport operation in which the generator must be turned and grounded with full safety. Airpes designed a solution for the client that included rotator lifting beams.
Need to solve
To transfer coil around entire factory regarding two specific issues: 4% ramps and train rails in some places.
INITIAL SITUATION
A major multinational company needs to rotate a 175 T. generator. This generator must be flipped and inserted into a test bench in its axis position.
The client has two 100 t. cranes.It’s a complex rotating operation in which the generator must be turned and grounded with full safety. Airpes designs a solution for the client.