Because of COVID-19, our engineers are unable to help overseas customers to install overhead cranes. In this case, we will provide customers with the most detailed installation instructions and provide online guidance. If we have local partners, we can also invite partners to guide the installation. Today we want to share the installation of a 10 ton overhead crane from the ฟิลิปปินส์
In order to fix the track of bridge crane, each track is connected one by one with splint, and then the rail is locked on the bearing capacity by pressing plate or bolt. At the same time, the track distance is measured to match the span of the crane beam. If there is any error in the bearing beam level, steel plate should be added to ensure the track installation level. AC speed regulation system generally adopts thyristor stator voltage regulation, energy consumption braking, eddy current braking, hydraulic push rod braking, multi speed motor and dual motor schemes. The capacity of the motor, resistor and other primary components of the speed regulation system should be selected and checked according to the actual working conditions. When the hydraulic push rod brake is used to improve the speed regulation of the tissue, the support brake should be provided.
เราเป็นผู้ผลิตเครนที่ตั้งอยู่ในประเทศจีน โดยให้บริการปรับแต่งเครนให้แก่ลูกค้าเครนทั่วโลก หากต้องการปรับแต่ง Overhead Crane สามารถฝากข้อความไว้บนเว็บไซต์หรือ อีเมล:sales010@cranesdq.comบอกพวกเราทำตามข้อมูลของเราและการขายตัวจัดการจะติดต่อคุณ:
คุณจะต้องป้อนข้อมูลที่ติดต่อแบบฟอร์หรือส่งอีเมล์. หลังจากได้รับข้อกล่าวหาของคุณเราจะติดต่อคุณทันทีที่เป็นไปได้และให้คุณอยู่กับคนเหมาะสมข้อเสนอ
ติดต่อของผู้เชี่ยวชาญมารถเครน
ส่งข้อความมาถึงพวกเราและพวกเราจะกลับมาหาคุณเร็วที่สุดเท่าที่เป็นไปได้